From small business to enterprise, everyone needs the skill set the SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 certifies. Test4Cram gets you there with 108 practice questions — clear topics, quick to absorb.
SAP C-TSCM42-67 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Exam Number: | C-TSCM42-67 |
| Certificate Validity Period: | Varies by SAP policy (typically no expiry for associate unless updated) |
| Real Exam Qty: | 80 |
| Passing Score: | 63% |
| Exam Price: | USD 550 (approx.) |
| Exam Format: | Multiple Choice, Multiple Response |
| Related Certifications: | C_TSCM42_66 (older ECC variant) SAP Certified Application Associate – Production Planning & Manufacturing with SAP S/4HANA Cloud (example related) |
| Available Languages: | Japanese, English, German |
| Exam Duration: | 180 minutes |
| Sample Questions: | ![]() |
| Exam Way: | Delivered online or at authorized testing centers (SAP Certification Hub / Pearson VUE) |
| Pre Condition: | No formal prerequisites; hands-on SAP ERP PP experience recommended |
| Official Syllabus URL: | https://training.sap.com/certification/c_tscm42_67-sap-certified-application-associate--production-planning--manufacturing-with-sap-erp-60-ehp7-g/ |
SAP C-TSCM42-67 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Master Data (LDM) | 8%-12% | |
| Topic 2: Production Orders Advanced (PP-SFC) | >12% | |
| Topic 3: Basics on SAP Business Processes | ||
| Topic 4: Material and Capacity Requirements Planning | >12% | |
| Topic 5: Application Overview and Background | ||
| Topic 6: Process Orders (PP-PI) | <8% | |
| Topic 7: Production Orders Basics (PP-SFC) | 8%-12% | |
| Topic 8: Lean Manufacturing (PP-REM, PP-KAB) | 8%-12% | |
| Topic 9: Material Requirements Planning (PP-MRP) | >12% |
SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Exam — FAQ
180 minutes, 80 questions — that's your time budget. Rehearse it: the Test4Cram online engine runs simulation tests with automatic settings, so pacing becomes trained, not lucky.
Files arrive first: our system emails your purchase within a minute of successful payment — unlimited installations, and 24/7 support if nothing shows up within 2 hours (check spam). Failure is covered too: take the corresponding C-TSCM42-67 exam within 60 days of purchase, and if you don't pass, submit a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam for a full refund, processed within 7 days. Exclusions: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. You can also choose a free replacement — two other products of equal value.
No formal prerequisites; hands-on SAP ERP PP experience recommended Eligibility rules change from time to time, so confirm the current requirements on the official page (official C-TSCM42-67 exam page) before booking.
The SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 blueprint spans 9 domains — including Material and Capacity Requirements Planning (>12%), Production Orders Advanced (PP-SFC) (>12%), Material Requirements Planning (PP-MRP) (>12%). The weightings are your study map: allocate hours where the points are. Every subtopic appears in the outline above.
USD 550 (approx.) per attempt, 63% to pass. Cost-effective preparation matters here: the 108 practice questions for the SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 cost a fraction of one retake.
Yes — download the free C-TSCM42-67 demo before buying and assess the quality and reliability yourself; it's the best way to avoid wasting money on bootless material. Purchases include 365 days of free updates, renewable later at half price.
The SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 is SAP's certification exam for SAP Certified Application Associate, at the Associate level. Passing it demonstrates proficiency with specific technologies — a credential employers from small business to enterprise recognize. Related credentials include SAP Certified Application Associate – Production Planning & Manufacturing with SAP S/4HANA Cloud (example related), C_TSCM42_66 (older ECC variant).
SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Sample Questions:
Which function is supported by production orders?
- A. Automatic reading of PP master data at order release
- B. Automatic selection of a work center at order release
- C. Automatic creation of transfer orders at order release
- D. Automatic printing of order documents at order creation
Correct Answer: C 🗳️
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.
What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
- A. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
- B. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
- C. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
- D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
Correct Answer: D 🗳️
Which of the following scheduling types can only be used in capacity planning?
- A. Forward
- B. Only capacity requirements
- C. Backward
- D. Midpoint
Correct Answer: D 🗳️
Which functions can be triggered before releasing a production order? (Choose three)
- A. Selection of a BOM
- B. Selection of a routing
- C. Scheduling
- D. Stock determination
- E. Confirmation
Correct Answer: A,B,C 🗳️
Which of the following requirements is supported by using process orders?
- A. Documentation of the production using an electronic batch record
- B. Linkage of documents to orders
- C. Use of production/resource tools
- D. Use of reference operation sets
Correct Answer: A 🗳️
Viewing page 1 out of 22 pages.
Viewing questions 1-5 out of 108 questions.


